on 03-30-2015 1:05 PM
Hi
I want to do the sizing for our client where the BPC 10 and BI 7.3 is on the same server as consolidation. I want to go for best sizing and parallely T-Shirt Based Sizing. Please suggest ..
Can you please share the link which help me in sizing for 50 concurrent users ?
Regards
Basis Team
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
This is a T-Shirt Based sizing. Any additional load factor to be considered because the server should have BW system also.
(1) Any Excel / Questionnaire template available for BPC / BW sizing.
(2) What are the key points to be considered ?
(3) Is it better to keep BW & BPC on seperate server ?
(4) As I propose the 3 server landscape. Is it require to keep the BPC server on BI or it is good practice to make it seperate server ?
Regards
Vimal
User | Count |
---|---|
14 | |
4 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.