Inspections for Iron incoming and out going materials.

Hello Experts,

I am implementing SAP QM fro hpp iron industry, My requirement is user wants the inspections with respect to quantity basis of finished goods. They don't want all specifications to be recorded in the system. They want to accept the inspection lots on the basis of quantity of material. How to go about this, what are steps we need to follow for this scenario.

Can you share your thoughts would be highly appreciated.

Srini

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Mar 30, 2015 at 09:25 AM

    Hi Reddy,

    Your requirement is not clear. Still what I understood from your requirement is they don't want to do results recording (RR) ?? they want to do only Usage decision and stock posting ??

    if this is the requirement then check the below link and make settings as mentioned in the link.

    SAP的学习和考试 Learning & Examination: ~ QM Insp Type 01 (GR to PO w/o RR only UD)

    Check and revert.

    Thanks

    Kumar

    Add a comment
    10|10000 characters needed characters exceeded

    • K V Kumar Nallapu Reddy Srinivasulu Reddy

      Hi Reddy,

      Please find my answers below marked in Bold.

      1. For Incoming Materials they do not want any results recording to be done, only after UD stock should move to UR stock quantity basis. (which you have send me screen shots).

      Follow the steps in the link already given which will meet your requirement.

      2. The above screen shots are same for inspection type 04 ?

      same thing will apply to inspection type 04 also

      3. They wanted CoA, certificate of analysis at the time of delivery, but there are some specifications given for CoAs. Is this possible with the above two requirements or anything we need to configure more for certificates.

      This is new question. as per the forum rules you should not post two different questions in the same thread. Kindly close this thread and open a new thread with the new question. If you want COA printing then you have to do RR for inspection lot. Without doing the RR from where you will fetch results to print on COA ???

      Thanks

      Kumar

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.