Hi Experts,
This is my scenario
FG consists of 4 operations like A, B, C & D. Each operation produces an SFG and output one operation is input of the next operation.
Operation A consumes RM and produces variant outputs like A1, A2, A3 & A4 (all are SFGs).
Operation B consumes A1, A2, A3, A4 & RM and produces variable outputs like B1, B2, B3 & B4 ( all are SFGs).
Operation C consumes B1, B2, B3, B4 & RM and produces variable outputs like C1, C2, C3 & C4 ( all are SFGs).
Operation C consumes C1, C2, C3, C4 & RM and produces variable outputs like FG1, FG2, FG3 & FG4 ( all are FGs).
Now
1. How to create a super BOM ?
2. If the Strategy group for FG is 25, then what is the strategy group for SFGs.
3. If KMAT material type for FG, then what is the material type I have to assign for SFGs.
Place your suggestions are appreciated.
Thnks