on 03-26-2015 3:08 AM
Hi,
A PO with GR-Based IV was created. GR performed and reversed the same day. System allowed invoice verification even when goods receipt quantity is 0.? is that standard behaviour?.. how do we stop it? is it something to do with setting up tolerance?.. Please advise which tolerance key to setup?
Umang
Set the tolerance limit DW as per your requirement from OMR6. and then set the message M8088 - Quantity delivered is zero as error from OMRM.
Then test the same scenario.