cancel
Showing results for 
Search instead for 
Did you mean: 

How to copy entire line command

Former Member
0 Kudos

    How to copy entire line command and deactivate the standard ?

Accepted Solutions (1)

Accepted Solutions (1)

jagan_gunja
Active Contributor
0 Kudos

In both PE01 & PE02 initial screen, to copy an entire schema or PCR, you can use the copy option.  It gives you a screen to enter the target object name.

In the maintain screen for both, you can use the line commands

a)To copy one line, enter R in the line no. area, to repeat the line immediately after the current line.

Or, enter C in line no area for the line you want to copy, then A in the line after which you want to copy.

b)to copy several lines, clear the line no. in the first and last line of the block to be copied, then enter A in the line after which the block is to be copied.

Note that after copying, you will need to change some lines in both schema/PCR, to ensure the logic and syntax is correct.

Examples are

- NEXTR or '*' to continue to next line,

- line no. indicator for next line.  either 1 to 9 or A-Z.

- any changes in decision key/s

- in some cases you may need to comment out the old line so that it is not operative.

Former Member
0 Kudos

Thank you for answering Jagan

I will check and get back to you

Answers (1)

Answers (1)

VKP
Contributor
0 Kudos

Hi,

In the 00140  box , clear it and enter "i" and press enter one line will get inserted below, and manually copy paste each entry using ctrl c and ctrl v. (there is a way to copy entire line but I dont remember how)

Then in the 'D" column enter "*" (star) this will deactivate the stnd .

Former Member
0 Kudos

I know about "I"

I want to "copy" entire schema Each schema contains subschema When we double click on schema it contain numerous schemas I want to copy schema along with subschemas how would i do that

i know how to deactivate