How to set Delivery complete indicator when PO is released

I demanded to set PO delivery complete indicator with Z-program

though PO delivery was not yet finished. And PO 's status is

approved.If i use BAPI_PO_RESET_RELEASE to cancel approved before

i change PO with BAPI_PO_CHANGE ,there will create a cancel

approve record automaticly, but key user do not want this

information. When i do GR by MIGO or MB01 system will set DCI

automaticly though PO was approved.So can anyone tell me how can

MIGO or MB01 do that.I was tried to track MIGO or MB01 ,but i am

failed for found some useful informations.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Mar 25, 2015 at 06:41 AM

    You can do so at the time of PO release (ME29N),

    Use badi ME_PROCESS_PO_CUST method Process_item. Change the value ELIKZ.

    Hope this helps.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks, But key user do not want a modify record created automatically , and approve authority disabled.I just want to copy some code from MIGO or MB01 used in a Z-program, but i can't find it

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.