Planned orders appears in RRP3 but when published doesn't appear in ECC?

Planned orders appears in RRP3 but when published doesn't appear in ECC ?

Help me with CIF procedures to bring it to ECC. (without using C5) because i need to convert to production order.?

Thanks

Ohio

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Mar 20, 2015 at 10:44 AM

    Hello Rahul,

    Please check the publication setting for location in-house production in /SAPAPO/CP1.

    Check active integration model in CMF5, if missing create the integration model by CFM1 and CFM2.

    Also you can run the delta report /SAPAPO/CCR or post processing report /SAPAPO/CPP1 for planned order to transfer.

    Also check the CIF application log SLG1.

    Best Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.