Skip to Content

No entry in table T551A

Hello experts,

I am getting following error while creating set work schedule rule.

Error "No entry in table T551A" for key 55 NPWS here NPWS is my period work schedule

The actual prob is i configured all the necessary steps but when i tried to create work schedule rule im getting this error. Also, in the same screen there is one field DWS grouping initially value in this is 00 and gread mode. But after giving ES grp, holiday calander ID etc etc when i try to save that screen that value is chainging to 55 from 00.

My ES grop=2 and PS grop=2 . Is that value is my ES and PS grouping..?? or some other thing.

Request you to please help me out.

Thanks and regards,

Shahbaz

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Mar 18, 2015 at 04:05 PM

    Hi Shahbaz,

    Please go through the below document which gives step by step explanation for creation of WSRs.

    Public Holiday Calendar and Work Schedule Rules

    It also explains the concept of groupings and how the best practices.

    There is personnel subarea grouping for DWS and personnel subarea grouping for WSR. There has to be a link between them. Also, the personnel subarea grouping is used for DWS, PWS and WSR.

    I would recommend that you keep the same personnel subarea grouping for DWS, PWS and WSR as explained in the document.

    Hope it will resolve your issue.


    Regards,

    Vivek

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 19, 2015 at 04:24 AM

    As far i understand error is saying that with grouping 55 NPWS period work schedule is not exist check whether you have configured PWS or not with the right grouping.

    Regards

    Venkatesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 19, 2015 at 04:53 AM

    In which process/step is this problem being found? Is it in time eval or payroll?

    In leave provision calculation (in payroll run), it is possible that it may be trying to get the time results for the next 12months and may not be able to find the WS in a future month. Usually WS is generated for 12m or more (in PT01 txn).

    I

    t is also possible when time eval or payroll is retro'ed it may not find the WS for a past period.

    In txn PT02, display the work schedule and go to the particular month/year where the problem is occurring. If it is absent, then it has to be generated.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 12, 2016 at 04:28 AM

    Hi Shahbaz !

    Check your Grouping in Personnel Subarea groupings & Daily Work Schedule grouping.

    Because of the mismatch it is giving you error.


    Error_key 55.png (11.5 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.