Hi all

I have a maintenance plan which have the time of call object as 3 months.After three years i want to change the duration i.e package as 9 months.I added the package in maintenance strategy and added that to task list.After scheduling i can see that a next call is after 3 months. But i want it to be 6 months. please suggest what is missing.

Thanks

Kartik

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Mar 11, 2015 at 09:09 AM

    Greetings Kartik,

    Please restart the Plan from a date 3 months ago. Please test this in IP10 and confirm. Consider any other packages apart from 3M and 9M.

    EDIT: Sorry, I misread your question in the initial answer.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.