Skip to Content
0
Former Member
Mar 10, 2015 at 03:02 PM

UNBW Material Costing block

198 Views

Hi Gurus ,

Please let me know how to block the material(Material Type- UNBW) for being costed in standard costing .

UNBW material type doesn’t have the costing view so we cannot on the “No costing indicator” in material master & we don’t want to use the “Bulk material indicator “ in material master or in BOM .

We cannot use “No costing “ indicator at each & every BOM item level .

Please suggest any other way to block the same for being costed .

This material (Material Type – UNBW) is being used as a BOM component .

Thanks,

Regards,

Aman