Hi,
We have maintained activity rates in KP26 and when we plan activity the system is using the planned rates from KP26 - this works as expected however if I change the rate in KP26 for example from £50 to £70 and go back the activity in CJ20n and run the edit-costs-calculate and also edit-costs-update then run edit-costs - actual/plan the planned value of £50 is still being used. I would expect the system to use the £70 rate.
I have checked in OPUV and the setting "Determine planned costs" is set.
In OPL1 I have the following settings:

has anyone come across this issue before?
thanks
Joe