Skip to Content
0
Mar 04, 2015 at 09:46 AM

insp lot without specification or Task list ?

250 Views

Hi Gurus,

I am creating inspection lot by doing Raw material GR. in material master i have maintained the data like inspection with material specification,

but i have Not Maintained any specification for this material , so as for the standard behavior insp lot need to be create with CRTD status, but hear it is created with REL status.

i have tested the same scenario in my QAS there INSP lot created with status CRTD, but the same in DEV it created with REL status, can anybody let me Know , what is the configuration needed to control this .

Regards,

Mahesh.