Skip to Content

How to connect java system netweaver 7.3 to solman 7.1

Hi,

I want to connect Java system netweaver  7.3 system to solman 7.1 to generate stack.xml file to apply patches. I am new to this, i need step by step procedure to perform this task.

Thanks in advance

Regards

Manjappa

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • avatar image
    Former Member
    Feb 06, 2015 at 08:39 AM

    You need to install diagnostics agent on your NW 7.3 server.

    Then perform solman_setup --> Managed system configuration for your NW 7.3 server on Solman.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 06, 2015 at 09:54 AM

    Dear Manjappa,

    normaly this way

    1) configure your java system to send data to your solution manager sld (or syncronizing ones)

    Setting Up the SLD Data Supplier for AS Java-Based Systems - Configuring, Working with and Administering System Landscap…

    2) Wait or force the lmdb syncronisation

    3) Setup the connection via Managed System Configuration (solman_setup -> SAP Solution Manager Configuration)

    4) You can not start a MOPZ or Maintainance Cycle via lmdb to generate a stack file

    best regards

    Peter

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 06, 2015 at 10:26 AM

    Hi Majappa,

    I have had this requirement also from my Basis Colleagues in Solution Manager 7.1...

    Process I followed:

    1) Install a diagnostics agent on the NW7.3 system

    - Download the latest SWPM from Software Downloads | SAP Support Portal

    - Download the appropriate Kernel

    - Run sapinst to install the Diagnostics Agent

    - Continue installation, connecting the Agent to the SLD of the solution manager system and set up the direct connection to Solution Manager.

    - Installation complete

    2) In Solman 7.1 - SOLMAN_SETUP transaction, go to System Prep > Step 6.7 > edit > get agents to ensure that your Diagnostics Agent has connected successfully to the Solution Manager System ( Green Icon ).

    3) Managed System Setup - Complete steps "Assign Product Information " and " Enter System Parameters - But mainly the RFC Creation Step.

    Creating the RFC's is the main focus after assigning the Product Information!

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 06, 2015 at 10:44 AM
    Add comment
    10|10000 characters needed characters exceeded

  • Feb 10, 2015 at 05:45 PM

    Hi

    Have a look to the following Document - SAP First Guidance - SEM/BW Configuration in So... | SCN

    There you can find the correct procedure to connect the Systems despite if it is a ABAP or JAVA based System.

    Best Regards Roland

    Add comment