Hello Fellow Experts,
I'm using RBA location substitution to create a STR and confirm order
Three locations: L1, M1 and N1
Product: PA1
Stock at L1 is 0, Stock at M1: 100 and N1: 100
Location substitution list in location determination procedure is setup like:
L1-->M1
L1-->N1
In this case system creates a STR from M1 to L1 because that's how its setup in the location substitution list based on a Fan Shaped Procedure Type 2
However the fastest way to meet the customer CRD is through N1 due to the routes, pick, pack or holidays involved. Is there a way to optimize the logic to meet the CRD date
Thank you!
Hi
If N1 is the preferred location, then why do you not maintain the access strategy from top of the list and maintain N1 first in the list of substitutions?
Parth Soneji
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.