Process starting to fast (merged messages)

Hello all,

we have an problem with merged messages in our PO with the following scenario.

The process starts with a CLSMAS and a qualifier. Now we wait for a Z_IDoc for the merge.

The corelation happens with the product group. If we send the IDocs manually the is no problem (1 pair: CLSMAS/Z_IDoc).

But if the delivery happens via workflow, the corelation doesn't work.

Example for the same product group successively:


1.) 1 CLSMAS and 1 Z_IDoc (change) corelation with the product group 1234

2.) 1 CLSMAS and 1 Z_IDoc (delete) corelation with the product group   1234

The problem is that the second CLSMAS (delete) comes before the first instance is finished. And there an now 2 open instances with the same corelation_ID that whait for

the Z_IDoc with the two same corelatin_IDs for the merge and the instance doesn't know which is the right.

Any ideas to solve this problem?

Regards

Igor

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Jan 13, 2015 at 06:26 PM

    i believe that's your design problem.

    and your description is quite unclear

    Add comment