Backdated stability study

Dear Friends,

My client receives the samples for stability incubation from
the different companies, where it had already kept for the stability study and
because of some of the business terms it transferred to our client to perform
the further study. Products was already undergone for the stability study, e g
testing for the time point 3 M, 6M, 9M and 12M is already carried out in the
sending plant and here it kept for study from 18 M to 60 Months.

Now our requirement is after charging in stability, system
should schedule the stability from 18 months time point only, as 3-12 months
stability study is already carried out. System is not allowing me to proceed
ahead and gives me error when I try to schedule in the back dated. We don’t want
to start from the current date as system will create inspection lots for 3-12
months which calculated from the current date, we want the system to schedule it as per our requirement.

Is it possible by doing some enhancements ?

  

Regards

Amit

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Jan 13, 2015 at 02:46 PM

    Dear Ami,

    For this issue is possible copy the function module assigned in the action box for release the stability study for no check if the date is in the past, and change in the customizing.

    Add comment
    10|10000 characters needed characters exceeded

  • Jan 14, 2015 at 10:04 AM

    You have simple solution, start stability study then go to "ip10" and skip periods you don`t want to test and system will not create inspection lots for these periods.