cancel
Showing results for 
Search instead for 
Did you mean: 

Backdated stability study

Former Member
0 Kudos

Dear Friends,

My client receives the samples for stability incubation from
the different companies, where it had already kept for the stability study and
because of some of the business terms it transferred to our client to perform
the further study. Products was already undergone for the stability study, e g
testing for the time point 3 M, 6M, 9M and 12M is already carried out in the
sending plant and here it kept for study from 18 M to 60 Months.

Now our requirement is after charging in stability, system
should schedule the stability from 18 months time point only, as 3-12 months
stability study is already carried out. System is not allowing me to proceed
ahead and gives me error when I try to schedule in the back dated. We don’t want
to start from the current date as system will create inspection lots for 3-12
months which calculated from the current date, we want the system to schedule it as per our requirement.

Is it possible by doing some enhancements ?

  

Regards

Amit

Accepted Solutions (0)

Answers (2)

Answers (2)

0 Kudos

You have simple solution, start stability study then go to "ip10" and skip periods you don`t want to test and system will not create inspection lots for these periods.

0 Kudos

Dear Ami,

For this issue is possible copy the function module assigned in the action box for release the stability study for no check if the date is in the past, and change in the customizing.

Former Member
0 Kudos

Hi Ferran,

Can you tell me the exact customization and the other modification which I have to do to solve this issue.

Regards

Amit

busyaban7
Active Contributor
0 Kudos

Hi,

Please can you copy me as well.

Thanks,

Arijit