on 01-13-2015 1:13 PM
Dear Friends,
My client receives the samples for stability incubation from
the different companies, where it had already kept for the stability study and
because of some of the business terms it transferred to our client to perform
the further study. Products was already undergone for the stability study, e g
testing for the time point 3 M, 6M, 9M and 12M is already carried out in the
sending plant and here it kept for study from 18 M to 60 Months.
Now our requirement is after charging in stability, system
should schedule the stability from 18 months time point only, as 3-12 months
stability study is already carried out. System is not allowing me to proceed
ahead and gives me error when I try to schedule in the back dated. We don’t want
to start from the current date as system will create inspection lots for 3-12
months which calculated from the current date, we want the system to schedule it as per our requirement.
Is it possible by doing some enhancements ?
Regards
Amit
You have simple solution, start stability study then go to "ip10" and skip periods you don`t want to test and system will not create inspection lots for these periods.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Ami,
For this issue is possible copy the function module assigned in the action box for release the stability study for no check if the date is in the past, and change in the customizing.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
10 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.