cancel
Showing results for 
Search instead for 
Did you mean: 

Account determination for Plant Maintenance

Former Member
0 Kudos

Hi gurus

My client has requested a change in the account determination of plant maintenance.See image below

After my research.I have discovered that for the material section,we use OBYC ,on valuation class for GBB.

My question now is on settlement on the labour part .I have searched for the allocation structure ,i don seem to see anything connected to this.I wanted to know where else i have to search for the 416 000 that is being picked for labour.

Regards

rejoice

Accepted Solutions (0)

Answers (6)

Answers (6)

Former Member
0 Kudos

hi

My issue is as per image below

I need part B( i  )the material acc should Dr 475500 and CR 404011.How do i achieve that.

Regards

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

OK...You have posted/consumed material in PM ORD   is it correct? and have already posted to

Consumption GL Dr and Stock GL Cr...is it

Now you want to settle the PM ORD to cost center... so why again you want to post in FI?

can you clarify?

Former Member
0 Kudos

Hi guys

My challenge now is on the material again.This is the document i managed to print after settlement.

The material component was supposed to DR 475500 and Cr 404011.is there somewhere else i should have set these accounts besides OBYC.

Regards

Rejo

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

In OBYC GBB define same a/c in debit and credit...you have defined separate a/c

Former Member
0 Kudos

Hi Kamal

In OBYC it was originally same account e.g 475500 on both DR and CR.So i thought if we change the the accounts then i might get a solution .but it still works the same.

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Can you now please explain your present issue...

1. !st issue you find it out from where the a/c is coming

2. You should maintain same gl in dr and cr in GBB/VBR

former_member198650
Active Contributor
0 Kudos

Hi,

It seems allocation cost element. Check the activity type master data in KL02 for the cost element.

Regards,

Mukthar

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Pl go to KA02 and see the CE 416000....what defined in cat of that CE  then we can identify where it has been defined

Former Member
0 Kudos

Hi Mukthar

i am using activity type C3 and thats the screen shot below.

regards

Rejoice

Former Member
0 Kudos

Hi Kamal

The screen shot for Ka02 is as follows

regards

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

So it is primary cost element...so it is picking from below range

In your allocation struct source defined from 300000 to 899999 CE

Now you can get rid of from this issue by creating a CE group without  416000 and assign the group in allocation structure inplace of CE range

Former Member
0 Kudos

Hi

I managed to find where the labour account had been assigned.See images Below

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

In your allocation struct source defined from 300000 to 899999 CE

So 416000 is coming within that range

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Seems that this is a assessment cost element. Kindly check 'Assessment cost element' in allocation structure.

Rajneesh

Former Member
0 Kudos

hi Rajneesh

Thats the screenshot for assessment cost element

regards