I have created one PCR as attached. This PCR is stating that If PL at the end of the year is <= 5 so carry forward as it is. If it is >5 then carry forward only 5.

This PCR has also been inserted in the schema. but i am not getting the desired out come.

Please help me to sort out this problem.

Thank you

Amit

Accepted Solutions (0)

Answers (2)

Answers (2)

Sanky
Active Contributor
0 Kudos

Hi,

Your PCR placing is wrong.

What your are saying that "If PL at the end of the year is <= 5 so carry forward as it is. If it is >5 then carry forward only 5".

After generation of the Quota then only you will check the quota balance with your require scenario.

In the PCR modify the same like below after HRS?5

HRS=FR07C

HRS-5

HRS=R

HRS*-1

ADDDBCFL5

UPDTQA07

Insert this PCR after QUOTA function with P2006 function and after this PCR line inser function CUMBT.

You can also check the document link

Regards,

Sankarsan

Sanky
Active Contributor
0 Kudos

Hi Amit,

If it's answered then close the thread.

Regards,

Sankarsan

venkateshorusu
Active Contributor
0 Kudos

Go through below links you may able to resolve the issue.

Regards