GATP Multi Item Single Delivery Config

former_member184509
Participant
0 Kudos

Friends

I need to configure Multi Item Signgle Delivery Process.

I have been researching in SAP Library , I got some information, but it is not so clear. it is bits and pieces.

Can you pls mention to me step by step process of Multi item Single Delivery configuration step pls?.

Thanks in Advance.     

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Rusheek,

Under Rules Based Availability check in Config you need to define the following.

1. Define condition table - select Create condition table - give any number , select the fields you require from the catalogue. For Ex if you have given a number 901 and then added the fields like Sales org / Division / Sold - to - party  / Order Type etc., A table gets created as /SAPCND/KOTO910. you would need to create seperate condition table for Availability check and BOP

2. Maintain access sequence - you need to create Access sequence for both availability check and BOP.

dont check the box "exclusive" in the "accessess overview"

3. Maintain Condition Type: Here you maintain condition type and add the access sequence which you have created. generally for easier understanding create condition type as ATP1 - for availability check and BOP1 for back order processing.

4. Maintain Rule Strategy - here the strategy is created, select the rule type " Inclusive". in the Control Data you enter the condition type which you created.

5. Maintain Rule strategy sequence - here you create a rule and in control data add the strategy to the rule which you have created.

6. Assign Rule strategy or rule strategy sequence - here you need to add the technical scenario + business Transaction+ Action type.

Tech scenario is the used to differentiate between a Dialog  / Batch / EDI Processing. you can use the following for Dialog use AA, Batch use BB, EDI use DD.

Businerss transaction - you need to define in VOV8 in ECC System the sales document type and add that in APO.

Action type - A B or C - A is Create, B is change, C is copy/

you need to assign the Rule strategy which you created in Step 4, and select "Substitute" in the column Handling of CP.

7. Activate Multi Item Single delivery location - Here you activate the MISL and add the Rule strategy.

After this you need to go to /sapapo/rba04 , and create rules, do not forget to select the rule type as Multi Item single delivery location. Also Maintain Location Determination procedure.

let us know if you get in to issues.


Thanks.

former_member184509
Participant
0 Kudos

Hi Rorrie P

Thanks for your input , I will configure this scenario based on your input and update you as soon as possible.

regards 

Former Member
0 Kudos

Hello Rorie,

Thanks for the detailed config.

Here is what is failing for me -

Sales order has material - PlantX001

Complete delivery is checked

Location determination has

Location        Costs  

X001             10

X002             20

X003             30

The sales order fails with two messages

MISL: No common loc. can be determined; check complete requirements group

No substitution for item 0120508655/000010 with "rules immediately"

Thanks in advance!

Suhail Shaik

Answers (0)