on 01-09-2015 10:42 AM
Hello,
Is there any way to determine a particular day from date specification through PCR.
Eg. Employee have date specification Z1 as 02.01.2015 then one time type should be set to "1" on 2nd of January every year.
Please let me know if further details of requirement required.
Best Regards,
Ketul Patel
Hi Patel,
Share your query in details. You are giving the solution by which difficult to understand.
Regards,
Sankarsan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Requirement is :
A date type Z1 is maintained in IT0041 as 02.03.2006.
Now i want to set Time Type 9001 as 1 on every 02nd of Mar (As 02.03 is maintained in IT0041).
And time evaluation is not allowed to run from 02.03.2006 (no forced recalculation).
Is there a operation or Function to achieve the same.
Regards,
Ketul Patel
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.