on 01-08-2015 10:40 PM
Good day SAP experts
I have a question, when i run the MPS for the hole plant there are some FERTs that share the same packaging material , for example Ferts: 10001, 10002, 10003 and 10004 share the same package material with number 300100, whats happening right now is that when the Ferts generate a dependant requirement for the packaging material for example each FERT needs 10,000 EA when we run the MRP the system is generating 4 Purchase Req for the same material 300100:
-----------------------------------------------------------------------------------------------
Mat:300100
plant:2010
date MRP/el MRP element data Reqmt unit
20.12.14 PurReq 4500012634/00010 10,000 EA
20.12.14 PurReq 4500012635/00010 10,000 EA
20.12.14 PurReq 4500012636/00010 10,000 EA
20.12.14 PurReq 4500012637/00010 10,000 EA
--------------------------------------------------------------------------------------------------
The thing is i need that when i run the MRP instead of having all those Pur Req i need the system to generate just One Pur Req for the total , that is:
-----------------------------------------------------------------------------------------------
Mat:300100
plant:2010
date MRP/el MRP element data Reqmt unit
20.12.14 PurReq 4500012630/00010 40,000 EA
--------------------------------------------------------------------------------------------------
how can i achieve this?, can i do it with configuration or Bapis or with material master data?, thank you in advance for your kind help.
Kind Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.