Creating planned orders in MRP area

Hi

We have a business requirement due to which I am creating a new MRP area in APO and want to create planned orders there using SNP

I CIFed the MRP area, products are extended, PDS is extended, tlane is created.

But when I run heuristics, its not working correctly. First of all, system creates a firmed planned order in the main location (for ex 8000) without any source of supply in addition to the Distribution receipt to the 8000_MRP. The Firmed planned order however is not considered in total receipts, so not sure why it is being created there.

At 8000_MRP, i see the Distirbution demand planned, but when i run planning, it is not creating any orders or giving short dump.

I tried same set up with PPM, I am able to create the planned orders at 8000_MRP with the source of supply assigned.

The firmed planned order at 8000 still occurs.

We want to do the setup with PDS.

Any inputs?

Thanks

Hari

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Jan 08, 2015 at 08:11 PM

    Hi,

    Please check the MRP AREA Customizing to see the settings (t.code /SAPAPO/MRPACUST01).

    Thanks

    Marius


    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      Please check your model with /SAPAPO/TSCONS and /SAPAPO/OM17. At tr.lanes you have to maintain means of transport too.

      You can also use the model consistency check /SAPAPO/CONSCHK to find possible errors.

      Thanks, Marius

  • Jan 27, 2015 at 09:38 AM

    Hello Hari,

    Please refer consulting note    591115 - MRP areas in APO (documentation)

    In ECC MM02, 'MRP 4' view, open the relevant production version and fill the field "Receiv. location"(MKAL-ALORT) with the storage location that is assigned to your MRP area.

    From ECC, transfer the PDS to APO again via CURTO_CREATE so that the receiving location information will be updated in APO.

    In APO, recreate or re-explode the planned order check the same.

    Best Regards,

    R.Brahmankar