Stock Consideration during SOP

Hi Guru's,

I am implementing SOP at my client. They gather requirement of material at sale office level. From all sale office they gather all data and prepare one centralize data for manufacturing plant (one manufacturing plant).

1. Which one Standard SOP Ya Flexible planning is better?

2. how to consider existing stock during sale plan preparation ?

3. Capacity planning is possible in flexible planning for production of material at production line?

Please guide.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    Jan 05, 2015 at 06:38 AM

    Hi,

    If you want to consider stock during SOP then you need to use the info structure which is having key figure as STOCK...check the below screen shot...it can be considered during both Standard SOP & Flexible planning..

    Thanks

    Kumar