Skip to Content
avatar image
Former Member

MM-PM Integration cycles for Spare Parts Materials-Fleet Management

Dear Gents,

Kindly advice for how i can link spare parts to the Vehicle Type and Model.

Regards,

Mustafa

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

4 Answers

  • Jan 04, 2015 at 12:00 PM

    Hello Mostafa,

    This is basically a Query about Material master coding. We know that Material code (MATNR) is 18 character long. Usually it is comprised as shown below.

    You can use the Main Group OR Sub group part for your Vehicle Type. Accordingly you can use Sub group OR Sub-sub group for the Model number. The Main Group often represents the Material Group (MATKL) of the Material Master.

    I do not see any PM link necessity here. The PM-MM integration starts from Serialzation of Materials. Other areas of integration are: 1. through Construction Type field of Equipment/FLocn Master and 2. Equipment/Functional Locn BOMs.


    Hope this answers your query.

    KJogeswaraRao


    Capture.JPG (26.2 kB)
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 04, 2015 at 08:13 PM
    Dear Jogeswara,

    This sound good, but could your provide me the further details to configure it step by step.

    Regards,

    Mustapha

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 05, 2015 at 08:56 AM

    NO I mean the sequence and linking its first time to engaged on this case for Main Group OR Sub group part for your Vehicle Type. Accordingly you can use Sub group OR Sub-sub group for the Model number. The Main Group often represents the Material Group (MATKL) of the Material Master.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 05, 2015 at 10:19 AM

    Hi Mostafa,

    I would suggest use SAP central function class and characteristics to

    relate spares with their model and fleet type.

    If you build spare masters then you can have standard reports CL30N

    Add comment
    10|10000 characters needed characters exceeded