cancel
Showing results for 
Search instead for 
Did you mean: 

MM-PM Integration cycles for Spare Parts Materials-Fleet Management

Former Member
0 Kudos

Dear Gents,

Kindly advice for how i can link spare parts to the Vehicle Type and Model.

Regards,

Mustafa

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Mostafa,

I would suggest use SAP central function class and characteristics to

relate spares with their model and fleet type.

If you build spare masters then you can have standard reports CL30N

Former Member
0 Kudos

HI Ramesh,

Could you provide the example with steps  its first time to handle this case.

Regards,

Former Member
0 Kudos

NO I mean the sequence and linking its first time to engaged on this case for Main Group OR Sub group part for your Vehicle Type. Accordingly you can use Sub group OR Sub-sub group for the Model number.  The Main Group often represents the Material Group (MATKL) of the Material Master.

Former Member
0 Kudos
Dear Jogeswara,

This sound good, but could your provide me  the further details to configure it  step by step.

Regards,

Mustapha

jogeswararao_kavala
Active Contributor
0 Kudos

Creating or Configuring Material codes belong to MM space and is a very fundamental thing to ask for in SCN.

jogeswararao_kavala
Active Contributor
0 Kudos

Hello Mostafa,

This is basically a Query about Material master coding. We know that Material code (MATNR) is 18 character long. Usually it is comprised as shown below.

You can use the Main Group OR Sub group part for your Vehicle Type. Accordingly you can use Sub group OR Sub-sub group for the Model number.  The Main Group often represents the Material Group (MATKL) of the Material Master.

I do not see any PM link necessity here. The PM-MM integration starts from Serialzation of Materials. Other areas of integration are: 1. through Construction Type field of Equipment/FLocn Master and 2. Equipment/Functional Locn BOMs.


Hope this answers your query.

KJogeswaraRao