Upgrading BI java from NW 7.01 SPS 13 to NW 7.4 SPS 9 stack file issue

Hello All, We are upgrading BI java from NW 7.01 SPS 13 to NW 7.4 SPS 9. Abap has been successfully upgraded with valid stack file. But BI Java part is not getting calculated in the stack file till NW 7.4, its only going till 7.31. We are not sure why the MOPZ behaves like this for Java upgrade stack calculation, when ABAP stack calculation is successfully done. Note: PAM, notes, Upgrade Paths, everywhere it says that BI java upgrade is possible as ABAP upgrade. Nowhere Java part seems mentioned that its not possible. Please guide if anyone faced this kind of issue. Regards Munish

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • Jan 04, 2015 at 05:53 AM

    Hi

    Is it Dual stack? if it is yes mean you have to perform the SAP dual stack split. and then do the calculate the Java stack from solution manager

    BR

    SS

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 04, 2015 at 08:24 AM

    Do you have Landscape verification result all OK ?


    Update CIM content of you Solution manager system.


    Also, In your Solution Manager, apply below note if it is applicable.


    1935993 - SMSY: EHP7 - Product data is missing


    Regards,

    Ashish

    Add comment
    10|10000 characters needed characters exceeded

    • Hello Ashish, Landscape verification is OK. CR content is latest, last week applied. This note is not valid as we are upgrading NW BI java system. Regards Munish

  • Jan 04, 2015 at 05:14 PM

    addition to above message Stack file calculation is throwing below errors in mopz selection for 7.4, this is java system, not abap system, don't know why its giving this warning, checked all LMDB, all relations, but not found anything related which is pointing to abap. ABAP Queue Check FAILED with SY-SUBRC '2'. Result status 'Error during calculation' ('E'). OCS package SAPK-747BHINSAPBSFND does not match the current software

    Add comment
    10|10000 characters needed characters exceeded

  • Jan 06, 2015 at 11:12 AM

    Hi Munish ,

    Please check the following Note , if not already , and make sure you have all the required corrections on the solution manager

    1887979 - Requirements before opening a message for MOPZ


    Thanks ,

    Manu

    Add comment
    10|10000 characters needed characters exceeded

  • Jan 06, 2015 at 11:45 AM

    Hi Munish,

    Can you share the snap shot of technical system 'software section' ? What is the landscape patter that you have selected ? Sidecar or HUB ?

    Also, for production version/instances, where have you used ABAP and JAVA product system ?

    If you can share these details, may be then we can help.

    Regards,

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member MUNISH JINDAL

      Hi Munish,

      After going through all reply, Can you please confirm if your Products are marked as relevant in SMSY/LMDB for As ABAP instance server, BI. and also in case of it its not a dual stack systems, but in LMDB or SMSY, You JAVA component has to be marked in Relevant Column for JAVA for SAP NW - BI Java. Once this is Done and LMDB is in Sync with your Systems.

      You can see the BI & JAVA servers appear in your Mopz calculation. do a Sync with SLD, LMDB.

      Once done let us know the status. Do Share the screenshot of SMSY or LMDB.

      regards,

      ram