Skip to Content
avatar image
Former Member

SAP BI Process chain issue

Hi,

Iam facing one problem in process chains..

I have 9 process chains for different locations. process chain it will triggered based on events.. when ever posting will complete from ECC after postings ending event will trigged.

In BW same  Data targets but different infopackages..

While activation of DSO for particular location chain, another location try  to activating during the same time.. activation getting failed.. this data will be updated into one particular cube.. for particular chain having below 2000 records only..

this data will BO every 1 hour...

1 Particular Location chain DSO activation is going on another 2 Location chain trying to activate how to stop for some time... 2 location chain


Data flow is BW 3.5..



Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Jan 01, 2015 at 01:09 PM

    Good afternoon,

    I see two possible options:

    1: Can you change the scheduling of the chains so that the activation of the data does not overlap?

    2: Can you have one activation process for the DSO after all data loads have completed for all related chains?

    Kind Regards,

    Des


    Add comment
    10|10000 characters needed characters exceeded

    • Hi Suresh

      If there is any logic written while loading data from DSO to infocube then you have to add the same logic in the new update rules/transformations to have consistent data.

      As I mentioned in my earlier response this is certainly high cost scenario for client.

      The most cost effective solution would be to control the execution of chains else generalize the DSO activation step.

      Ashish