694 No structure could be determined for internal activity

Former Member
0 Kudos

Dear Experts,

I am getting the error while running the CK11N I am able to see the values in kp26 coster/activity, in material master selected quatity structure under costing tab.

Why I am getting the bellow error I don't understand and I don't know how to fix it. Please help me from that.

Regards,

Mahi.

Accepted Solutions (0)

Answers (4)

Answers (4)

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Forst in CK24 mark the cost estimate and then release

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

you are welcome..please close the thread

Former Member
0 Kudos

Closed.

rajneesh_saxena
Active Contributor
0 Kudos

Great Mahi, you did it !!!

Thread will not be closed this way. Either you have to mark it as 'Assumed answer' or you have to give correct answer to the best suited answer.

The good part you have done is that you have mentioned how you solved it. This helps other visitors if they are stuck some where in the same problem.

Regards

Rajneesh Saxena

former_member198650
Active Contributor
0 Kudos

Hi Mahi,

Have you assigned activity costs to cost centre structure in OKTZ?

Regards,

Mukthar

Former Member
0 Kudos

Hi Muthar,

Yes I have assigned secondary cost elements in OKTZ.

Regards,

Mahi.

Former Member
0 Kudos

Hi Kama,

After assigned lot size1000 in material master still I m getting same error.

Regards,

Mahi

Former Member
0 Kudos

Hi Rajneesh,

Pleas guide me what I need to do next for come out from the issue.

Regards,

Mahi.

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Pl check  1. KL02     Act type cat  1

                                 Act price indicator  5

               2. KP26    Price should be defined in Variable also

Former Member
0 Kudos

Hi Kamal,

Same issue coming

KL02

KP26

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

You just create activity by selecting

     1. Acty Cat  as 1

     2. Allocation CE

     3 Pr Indicator as 1

     4.Act Pr Indicator as 5

All are not required

KP26     Fixed & Vari both price

Former Member
0 Kudos

Hi Kamal,

As you said even I m maintained the issue still coming. I have one doubt shall I run the KSPI for plan price calculation, if I need to run I have to maintain the cost center split settings ?

Is it correct

Regards,

Mahi.

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

i think it is not the issue related to act type or KP26

When are you getting this error? After CK11N please click on qty structure view and see whether routing is populated...also send the screen shot

I think problem in routing selection

Former Member
0 Kudos

Hi Kamal,

CK11N

CS02

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

You didn't get my point...you run CK11N

In cost estimate over view there is a tab "Qty structure" click on that and send screen shot..or you can analyse

Former Member
0 Kudos

Hi Kamal,

CK11N

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

From screen shot of cost estimate itemization all activity cost has come...so where is the issue?

When are you getting the message  ?

kamalkumar_biswas2
Active Contributor
0 Kudos

One thing ...you didn't maintain Production version

rajneesh_saxena
Active Contributor
0 Kudos

Hi

As I said in my earlier reply, kindly confirm whether you have maintained activity prices manually in KP26 or these are calculated by system through KSPI? If manually maintained then this message is obvious because price indicator at activity master is 1 i.e. price automatic calculation and system is not finding KP06/KP26 and KSPI values.

If that is not the case you need to check note  1872228 as this may be system error also.                .

Regards

Rajneesh Saxena

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Rajneesh

   But if you see the cost itemization it is showing all activity cost properly..

When he is getting this error?

   Actually I have tested it  without KSPI..it is working with KP26..only no primary cost comp split

   So..this error should not come....

   I have seen there is no Prod version defined in screen shot

   Thanks

rajneesh_saxena
Active Contributor
0 Kudos

Hi

You are right at your place Kamal but I have seen this message long back in my own system and the reason was that system was expecting auto calculation and I was giving manual price.

Secondly if we don't give PV, system takes first PV available with it. This is my observation.

Thirdly it may be a system error also for that I have mentioned the note.

Now we have to wait for OP's response.

Regards

Rajneesh Saxena

Former Member
0 Kudos

Hi Rajneesh,

In kp26 I have maintain price indicator 1 that means plan price automate calculate and I do not i have run KSPI and do not have maintain settings for cost center split in OKES but I am able to see the values in KP26.

Shall I maintain the settings for cost center split OKES.

Regards,

Mahi.

Former Member
0 Kudos

Hi Kamal,

After run the CK11N I am checking in the error log there I am getting this message.

Regards,

Mahi.

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

That is because you have not run KSPI and Plan cost splitting..and directly defined activity price in KP26...

You will only get cost itemization and not CCS actual cost splitting as per attributes defined in CCS.

But your cost estimation showing "Green"   is it ?

So..if you want to get CCS splitting...run plan cost splitting KSS4 and then KSPI

Pre-requisite: Cost planning in KP06 & KP26

former_member198650
Active Contributor
0 Kudos

Hi Mahi,

It is not error message. It is showing in green color. So you can skip this message.

Regards,

Mukthar

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Cost center splitting is a different concept and all the time it is not required. It is required only when you have some activity independent planning or actual posting on the cost center. I don't know whether it is applicable in your case or not.

I said/asked one simple thing: Have you maintained manual prices in KP26 i.e you have not maintained KP06 (plan expense) and KP26 (plan activity quantity) and have not done KSPI but you have price indicator as '1' in activity master, in this case this message is obvious becouse system is not finding any values to calculate activity price automatically and at the same time it is finding instruction to calculate activity price automatically from activity type master.

Regards

Rajneesh

Former Member
0 Kudos

Hi Mukthar,

May be that is the reason, I could not release the price i am getting bellow error in CK24.

Former Member
0 Kudos

Hi Raj neesh,

Yes I maintained prices manually in KP26, when I am release the price in ck24 I am getting bellow the error. I thought that is the reason i could not release (ck11n) the price in ck24

Cloud you plz guide me how can I trouble shoot.

Regards,

Mahi.

rajneesh_saxena
Active Contributor
0 Kudos

Hi

As Mukhtar and Kamal said that this is only a green message this can not stop you from release of std price. There may be some other reason.

In CK24 you have to first mark and save and with the same screen you have to release it.

Regards

Rajneesh

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Can you please paste CK24 front screen not the message screen

Rajneesh

rajneesh_saxena
Active Contributor
0 Kudos

First you have to click 'Marking allowance' and check inside this your co code is green or not if not select it give your costing variant and save. After that do other steps

Rajneesh

Former Member
0 Kudos

Hi Rajneesh,

ck24

rajneesh_saxena
Active Contributor
0 Kudos

Hi

In material master check costing 2 tab, price is coming in 'Future price' or not? if not that means that the price is not makked. So first mark and then release at CK24 itself.

Rajneesh

Former Member
0 Kudos

Hi,

Thanks to all for putting efforts issue has been resolved I have selected wrong period for marking ck24  I came to that and marked for the correct period in CK66 .

Regards,

Mahi.

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Seems your activity master contains price indicator 1 and you are giving activity price manually at KP26 hence you are getting this message.

Regards

Rajneesh Saxena

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Go to Material master costing view and change costing lot size to 1000