Source Inspection not possible

0 Kudos

Hello Experts,

I am trying to perform source inspection.

I had did the following.

  1. Created Status Profile and Assigned in the Quality info Record.
  2. Inspection type for Source inspection(0101) is assigned in the Quality Info record
  3. Created Inspection plan with 51 usage.
  4. Activated 0101 inspection type for the material master.

With the above conditions I tried creating the source inspection lot through QI07. But got the following message "Source insp. not possible due to rel. status"

But for the same material and vendor when I removed the status profile in the Quality Info record and tried creating the inspection lot through QI07, I was able to create inspection lot.

But when I assign the status profile in Quality info Record, not able to create Inspection lot through QI07 and comment is "Source insp. not possible due to rel. status"

Inputs required to sort out this issue

Thanks and Regards

Hari

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member207800
Active Contributor
0 Kudos

Please check configuration using current status of QIR.

SPRO > Quality Management > QM in Logistics > QM in Procurement > Define Status of Supply Relationships > Assign delivery status for inspection type

Regards

poovancheerirajendra
Active Participant
0 Kudos

Hi

Please check whether PO is relevant to Release strategy, If so release PO and check it.

former_member201849
Contributor
0 Kudos

Hi Hari

Please provide control key in QM view and check QM procurement active. Goto QI01 and in inspection control tab make changes as below and execute.

Regards

SURESH.M

former_member190267
Contributor
0 Kudos

Hello Hari,

Please refer to thread

There is some explanation about source inspection.

Regards,

Natália