Hello Team,

I want to distribute the planned order quantity as 1 for the same date in MF50 in some cases.

For Ex, If I have single planned order with qty as 5 for the date 20-12-2014, by using MF50, I want to create/distribute 5 different planned orders for the same date with each planned order as 1. Is this functionality possible in MF50 in standard SAP?.

Please throw some light on this. Advance thanks for your response.

Regards,

Venkat

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Posted on Dec 16, 2014 at 12:28 PM

    Venkatesh,

    How do you split this in to multiple orders on same date with one work center?

    If you have different production lines hence different PVs you can split on same date.

    BR
    KK

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 16, 2014 at 12:57 PM

    Hello Venkatesh,

    You can also split the planned order Shift Basis and you can distribute the qty shift wise or if you have multiple prod line then you can assign the valid PV and split the Qty as Kiran Kumar suggested


    Regards

    Umesh Mali

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 16, 2014 at 02:20 PM

    Hello Umesh / Kiran,

    Thanks for your reply.

    I have only one production line and single production version for that material.

    The production line have capacity of 10 qty for single day. So in this case, I want to distribute my single planned order qty with 10 to 10 single planned orders for the same day with qty as 1.

    Can we achieve this functionality by using distribution function keys in MF50?.

    Regards,

    Venkat

    Add a comment
    10|10000 characters needed characters exceeded

    • Venkatesh,

      No with MF50 it is not possible for splitting for single production line and PV.

      Check alternate options like fixed lot size as 1 or BADI MD_ADD_ELEMENT method ADD_CHANGE_ELEMENTS to create separate planned orders during MRP for different requirements on same day.

      BR
      KK

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.