Integrated Planning over BW 7.2 ( Release 702) SP 9 ( SAPKW70209)

Hi All,

Hi All,

There is a requirement to develop a BW Integrated Planning Cube for Maintenance Budgeting and i am currently developing the relevant test planning objects for this scenario to simulate the solution.


System information:

SAP BW 7.2 ( Release 702 SP level 9 (SAPKW70209))

Have checked Few SAP notes and could not catch hold of any notes.

Challenges faced:

1. Planning modeller lets me choose the provider & create Aggregation level over the selected infoprovider. However ends up with error messages as attached in this mail while creating filter.

2. Would also like to know if there are any other prerequisites which we are currently missing. ( JAVA STACK, PORTAL etc are already configured and i am able to create aggregation levels over the BW real time cube/ multiprovider )

3. Any other suggestions are welcome.

Regards

Nethaji

IP.JPG (122.9 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Dec 12, 2014 at 10:26 AM

    Hi Nathaji,

    there seems to be some confusion about the release: SAPKW70209 means that you have a NetWeaver 7.02 'release' (i.e. enhancement package 2); this is not BW 7.20; the latter would be based on NetWeaver 7.20 (exists but is not released for BW usage). In 7.02 still the Java Planning Modeler is used, as the screen shot indicates.

    The screen shot indicates some meta data problems since 0REQPLAN is not exposed in the modeling but a technical InfoObject used in the delta buffer. Check your basis InfoProvider used in the aggregation level, maybe meta data are not ok. You can use report RSR_MULTIPROV_CHECK to regenerate meta data for some InfoProvider types. If this does not help open a SAP problem ticket.

    Remark: SAPKW70209 is quite old, you may also consider to use a more recent support package.

    Regards,

    Gregor

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 12, 2014 at 09:16 AM

    Hi Nathaji,

    with BW 7.0 BI-IP moved back into the ABAP, so you cannot work with the planning modeler in JAVA anymore.

    Go to you BW and start RSPLAN.

    create Filter, Functions, Sequences there.

    Agregation levels you can now create in RSA1.

    regards

    Cornelia

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.