Skip to Content
author's profile photo Former Member
Former Member

VL10c - Delivery units from material master field "MVKE-SCMNG" are not considered While delivery creation

Hi All,

TC : VL10c

I am using a variant in VL10c. Whereas I want the system to consider Delivery unit (MVKE-SCMNG) of a material master in VL10c.

Currently it is not considering the Delivery Unit during delivery creation through VL10c.

Please help me out to handle the situation.

Thanks & Regards

Mohan Prasad

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 12, 2014 at 07:33 AM

    HI Mohan,

    Dont think any std configuration is available to get this.

    By doing modification in the program ( RVV50R10C) for this report, you can achieve this.

    Regards

    Jobi

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.