on 12-09-2014 11:07 AM
Hi experts.
We have a network activity and materials are assigned to that network activity. Now at the time of CN25 the backflushed materials are being consumed in the first confirmation, a parcial confirmation (PCNF). Is it a standard behavior? Why the materials are not consumed on the last confirmation (CNF)?
Best Regards
Hello Alessandro,
In OPST , check if Goods Movement indicator is ticked under Logs/Error handling section.
This indicator specifies that if you save a confirmation with goods movement errors (that is, backflushing or automatic goods receipt), then the system displays an error log before saving
The indicator is not evaluated if a process control key has been defined that does not allow the goods movements to be posted online.
Regards
Tushar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Alessandro:
Check the "Requirement Date for the Component" (Reqmt Date) and the "MRP Distribution Key" (Distribution) fields on the Material Component (General Data Tab).
Best regards,
Didier Bueno
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.