Equipment: change cost center assignment with a "valid from" date in future?

Dear colleagues,

we have the requirement to change the cost center assignment of some equipments by 01.01.2015.

As on this date no one is in office, I'm curious if there is a functionality which allows to me change right

now the cost center assignment with a validity from 01.01.2015 on?

Is it possible somehow to do such changes now, but with effectivity in the future?

Thanks for your inputs!

Regards,

P.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Dec 09, 2014 at 07:52 AM

    Hello

    As per STD SAP valid from date for equipment can not be in future

    Br

    Rakesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 09, 2014 at 09:02 AM

    Dear Patrick,

    maybe better way it's to schedule background job for mass change (LSMW)

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.