Skip to Content
author's profile photo Former Member
Former Member

ess issue

My work from ESS is showing a task in the universal worklist, however it produces error when opened,

error message : partner profile not available

what does this mean?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 09, 2014 at 07:36 AM

    can you please paste error screen shot.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Arpita,

      Which is the backend SAP system your UWL is connected with for pulling the tasks and for which you're facing this issue.

      Try to execute the task directly from SAP backend system and see if you face the same issue.

      You will have to login to R/3 system with the backend credentials of the user who owns the task and execute from there. Else, approach the user and ask him to test it in his / her SAP Inbox and check there is the same behavior there as well.

      In that case, ask your functional consultant to look into it.

      BR,

      Anurag

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.