Hi Expert :

the MD04 propose to us some planned order for some packed Finished product later the planner convert them to process order in some way we have one process order for each day .

the quantity of process order is calculated to satisfy the demand of Each day meaning each day we have a diffrent quantity .

in other side the local rule for warehouse : Batch can't exceed 27 Ton meaning if i have to produce 60ton i should have 3 batch ( 27+27+6 ) intead i have only one process order .

my question which parameters i should change in some how to have 3 process order limited each 27 Ton from MD04 intead of 1 process order with 60ton

Thank you very much

Accepted Solutions (1)

Accepted Solutions (1)

former_member184574
Active Contributor
0 Kudos

Hi,

Maintain maximum lot size as 27 in material master in MRP 1 View for the finished product then when you run MRP all your planned orders will be created up to 27 or less than that based on the requirement. With this you can meet your requirement.

Hope this helps..

Thanks

Kumar

Former Member
0 Kudos

Thank you very much for your quick and usefull answeer .

We did the same thing currently  we use : Lot-for-lot order quantity in lot size but something somewhere it didn't work because i still receiving one process order instead of 3 parallele process order with maximum quantity of 27 Ton

Thank you very much for your help

Khalid

kiran_kumar179
Active Contributor
0 Kudos

Khalid Bayi,

You should not use EX lot for lot instead You should use fixed lot size in case if you want system to generate planned orders for a quantity of 27 every time.

BR
KK

former_member184574
Active Contributor
0 Kudos

Hi,

Kindly close the thread if your issue is resolved by selecting which ever is correct answer and helpful answer so that this can be useful to other forum members.

Thanks

Kumar

Answers (1)

Answers (1)

kiran_kumar179
Active Contributor
0 Kudos

Khalid,

Try with Partial conversion of Planned order to Process order in COR7 for Required quantity.

BR
KK