Hi experts

We are introducing stock transport orders between plants in the same company code. Our process is as follows:

Requesting plant runs MD03 and is configured for stock transport orders from supplying plant. Stock level is below reorder point and a planned order is created. Convert the planned order to purchase requisition and do an availability check. If the supplying plant have sufficient stock on hand the full quantity is confirmed. In the case of insufficient stock levels a confirmed quantity is only received when adding both the requesting and the supplying plant planed delivery times and GR processing times together. My expectation is that if the requisitions delivery date is equal to or more than the PDT of the supplying plant, a confirmed quantity should be obtained.

Your assistance will be appreciated.

Kind regards

Michael

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.