Skip to Content
author's profile photo Former Member
Former Member

Due Date in MSMP instances

Hi Experts,

may you can give me a hint. I have the SAP_GRAC_FIREFIGHT_LOG_REPORT ProcessID configured in 2 GRC10 systems. It runs without issues on both systems and on the "Serach Requests" page I find the the status for all the MSMP instances.

So far so good. The only difference is that on one system the "Due Date" Field is populated and in the other not.

I ran out of ideas where the the configuration difference is. Do you know which parameter or flag needs to be set to get due dates populated?

Thanks in advance!

Andreas

pastedImage_3.png (16.6 kB)
pastedImage_4.png (15.3 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Dec 04, 2014 at 11:45 AM

    Hi Andreas

    Are these two difference environments in same landscape (i.e. DEV and PRD) or two different systems unrelated (i.e. different customers)? Which one is showing the due date?

    Are these systems both on same release and SP level? What configuration did you do in IMG for due date for the MSMP Process Id?

    Regards

    Colleen

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.