Hi Experts,

may you can give me a hint. I have the SAP_GRAC_FIREFIGHT_LOG_REPORT ProcessID configured in 2 GRC10 systems. It runs without issues on both systems and on the "Serach Requests" page I find the the status for all the MSMP instances.

So far so good. The only difference is that on one system the "Due Date" Field is populated and in the other not.

I ran out of ideas where the the configuration difference is. Do you know which parameter or flag needs to be set to get due dates populated?

Thanks in advance!

Andreas