on 12-29-2005 8:41 PM
Hi all,
I have the following problem: I loaded a delta from an ODS to cube and it failed. The QM Status is red. Should I delete this request and repeat a Delta load from the ODS to the cube? Will it bring in all the records that it brought the first time over?
Please help.
Thanks,
Ashmith Roy
Hi,
Make sure u make the total status as red in the monitor screen--which intimates the source system that the delta is not picked up.
Then delete the request by turning the QM status to red.
run the infopackage again.
It will pop a screen asking for repeat delta.
accept it and schedule the load.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
U should delete the failed request.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ashmith,
Goto the Data Target, and drop the invalid request.
Goto the InfoPackage corresponding to it and re-schedule the load.
Accept the REPEAT DELTA dialog box.
As long as u make the request green and reload the next delta u will not lose the old delta.
so just delete the invalid request and reload
Hope this Helps
Regards
Majeed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.