Reservation for Movement Type 309

Hi

I have came across a unique business scenario in which we have to move stock from Valuated material to Non-Valuated material.

Example is: One Material with Type ROH - Raw Materials

One Material with Type UNBW - Non Valuated Materials


Department will request warehouse to Transfer some quantity from ROH material to UNBW material. After receiving the material, department will use the UNBW material for their working.


As SAP is not allowing Reservation for Mvt Type 309, I have created a new Mov. Type 910 in which I mention the "Reservation Category" to "U" and enable the Cost Center, Receiving Material, Receiving Plant, Receiving Store Location field. Also I have checked the table (T156-RSTYP) and I found the entries there.


Now when I am running MB21, I am getting all the field except Receiving Material. Could anyone has idea why this field is not appearing.


If this is not possible (as I am not sure how system behaves with Accounting entry), could anyone give advice about how to accomplish that scenario.



Regards



Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Posted on Dec 04, 2014 at 11:16 AM

    Have you copied it from any standard movement type ?

    Have you tested the below :

    Go to OMBW, double click on the movement type, then double click on Transfer Postings and make the field Receiving Material as optional or required for the movement type 910.

    If you are not able to see the movement type in OMBW, then go to OMJJ, select movement type, enter 910, then select Field selection (from 201)/Batch search procedure and double click on the line item, then double click Transfer Postings and make the field Receiving Material as optional or required.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2014 at 11:50 AM

    Hi Imran,

    Can you check in OMJJ for 910 MT, in Field selection (enjoy) have you maintain UMMAT field as required or not and in Allowed Transactions MB21 T-code is maintained or not. If any of these two are not maintained then please maintain and do the testing once again.

    Thanks and Regards

    Arun Kumar Sahoo

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Arun

      I have tried without Cost Center as well but no success. For information, I included Cost Center because as I mentioned that One Material is ROH (Valuated) and other is UNBW (Non-Valuated). So system will not be able to transfer the value as other material is non-valuated.

      To cater this, I enabled the cost center in a way that system will issue the material cost on the cost center and the other non-valuated material will get the quantity update.

      Regards

  • Posted on Dec 04, 2014 at 02:05 PM

    I would expect that you got error message M7 500 Reservation for & is not possible. (Choose another movement type)

    Creating a new movement type will not change the situation as it is not an error message based on the number "309". There are different indicators in the movement type tables that are tested when this message is issued. And since you can only create a new movement type by copy of an existing movement type, the situation will certainly not change.

    Add a comment
    10|10000 characters needed characters exceeded

    • a one step transfer is for example a 311 movement, that is not an alternative for you.

      An alternative is a production order.

      If you don't have PP, then you may consider to use 201 movement to goods issue material A and 202 movement to receive material B.

      For the 201 movement you can create a reservation.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.