Skip to Content
author's profile photo Former Member
Former Member

Transform Urgent Change to Normal Change ?

Hello,

One of my customer have create a urgent change but it's actually a normal change.

How can I convert a urgent change to a normal change ?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Dec 04, 2014 at 11:27 AM

    Hello,

    I think it is easier to close the normal change and create an Urgent Change later.

    Best regards,

    Miguel AriƱo

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 04, 2014 at 12:57 PM

    Hi Marc,

    since SAP has different transaction type or workflows for urgent and normal correction you can't convert them.

    therefore if it is triggered wrongly just Withraw the Urgent correction or cancel it for Urgent change.

    further in the same change request or RfC you can use the Extend Scope option to create a new Normal Correction because it is not required to again create RfC from beginning.

    Please check my document below

    http://scn.sap.com/docs/DOC-46777

    Thanks

    Prakhar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.