Skip to Content
author's profile photo Former Member
Former Member

Overhead Structure

Hi all,

Currently we use same percentage rate for all company codes in our overhead structure ( T-code) : KSAI.

how can we maintain different percentage for one of the company codes ?

can we configure another overhead structure to define different rate for a different company code.

please advise.

Thanks

Rahul

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Dec 04, 2014 at 06:30 AM

    Hi Rahul,

    You can maintain the overhead rates for each company code. At the time of create over head rates select the dependency based on your requirement.

    Regards,

    Mukthar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2014 at 07:01 AM

    Hi..

    I think that you can refer the costing sheet “A00003” provided by SAP through t-code “KZS2”.

    The costing sheet “A00003” have dependency “D030”(Overhead Type/Company Code) as below picture.


    qw.png (11.7 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.