Skip to Content
0
Former Member
Dec 02, 2014 at 05:02 PM

Changing UOM on Planning or Logistics Tab

381 Views

I am trying to figure out a way to change the Unit of Measure for a material that was loaded incorrectly. This material is active but does not have a standard cost or any quantity on hand. I can change the base UOM and Sales UOM, however the above stated tabs remained locked.

Is there some workaround for this issue?

Thanks,

Matt