When we create a sales order for a material for which no cost has been determined, we do not get an error or any sort of prompt that one of the items in the order does not have a standard cost when the order is saved. When the order is costed, there is also no error, the system appears to be rolling up the costs of the sub-components rather than requiring there be a cost on the material variant itself.
We are using material variant configuration.
Our costing variant is set to with a valuation variant with strategy sequence "Standard Price" and "Standard Price 1" Based on this, I would think the system would require a standard price on all materials before it would allow a sales order to be costed.
As a test, we created material variant MV-T7-TEST. This material has never been costed and has no costs in the material master.
We create a sales order with this material variant in it, and it shows costs. We can save the order with no errors or warnings.
I am assuming the order is getting those costs from the standard costs of the components of the MV-T7-TEST even though there is no standard cost on the material in the material master.
When I go into the same order with VA02 and cost it, I again don't get an error, even though there is no cost on that material in the material master.
Why is the system doing this? Where is the configuration that controls which cost (BOM or standard cost from Material Master) is used in sales order costing?
Thanks much,
Andrea
Hi,
Generally sale order costing will run based on settings made in their requirement class & type. You can check the configuration settings in the below node.
Controlling - Product cost controlling - Cost object controlling - Product cost by sale order - Control of sale order related production.
Regards,
Mukthar
Hi
First of all what you have told that in valuation variant strategy is standard price & stnd pr 1..I think it was Standard price and plan price 1...
If my presumption is correct please check whether there is any plan price 1 in costing view 2 of Mat Master
Secondly whether your SO items are trading items or manufacturing items..if manufacturing then cost at costing view is relevant otherwise price at accounting view will trigger..
pl revert back for further query
Hi
Are you using product cost collectors? If yes this may be coming from preliminary cost est of PCC.
Regards
Rajneesh Saxena