cancel
Showing results for 
Search instead for 
Did you mean: 

Parallel run of the ETL schedules

Former Member
0 Kudos

Hi All,

I have 5 ETL schedules in SAP BODS3.1.

If two schedules run on same time will it causing the failure of any job?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

No, it won't cause failure.

thanks

Answers (0)