on 11-27-2014 6:46 AM
HI All,
I have an issue in QM where i do GR against Purchase order and Inspection lot created.
My setting in the material master are QM view are
1. Inspection type - 01
2.Post to Insp. stock - Deactivated
3. Automatic Assignment - Activate
4. Automatic UD- Checked
5. Skip Allowed - Checked
6. Check Chrs- Checked
7. Control inslot- For Each Material, batch and SLOC
When i did GR Insp.lot created and material doc posted with 101 movement and posted the stock to unrestricted.
Now i see the system status of my lot as LTCA CHCR CTCM
and user status as - NSPO
For some reason I see the lot is cancelled.
My question here is
1. If lot is cancelled means the the STATUS SPRQ will not be displayed? Is my understanding correct.
2. If I reset the lot cancellation will I get back the SPRQ status?
3. In which case does this status SPRQ will displayed in the lot? Is there any config in place.
4. Currently i notice the batch stock is not available in system anymore.
5. How do i check the lot cancellation material document
6. I don't see any UD for my lot. I hope the lot got cancelled before UD so that SPRQ status is missing is that right?
7. What needs to be done to bring back the status SPRq for the lot?
Regards,
MBN
Hi, I try to answer sequentially!
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.