Skip to Content
author's profile photo Former Member
Former Member

Line Selection of ALV table using BDC

Hi Experts,

we have a requirement in which we have to settle the AUC (Asset under construction) to fixed assets

using the AIAB transaction.

We are doing the BDC recording for this to settle AuC by preparing the distribution rule.

Problem :

In the BDC program, the BDC_CURSOR is not capturing the selected line value of the ALV table.

Please let us know, how we can use the BDC for the ALV table.

Regards,

Dixit Miglani

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 25, 2014 at 02:46 PM

    You can't use it in ALV.

    You will have to do an enhancement to in standard program.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 25, 2014 at 07:29 PM

    Hello Dixit,

    I guess you can achieve it using the User command. Refer to the below links, it might help you.

    http://scn.sap.com/thread/802236

    Regards,

    TP

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.