Skip to Content
author's profile photo Former Member
Former Member

DS job scheduling using solution manager?


Hi All,

Can we schedule DS jobs using SAP Solution Manager 7.1? Also can we transport objects developed from one environment to another (i.e DEV -->QA ) apart from export option in DS or using central repository using SAP solution manager?

Kindly help on this.

I have read the we can monitor jobs in solution manager if we are scheduling jobs using BOE scheduler.

Regards,

Karthik Rajan P

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Nov 24, 2014 at 02:27 PM

    We can schedule jobs in both the ways:

    1) Data Services scheduler

    2) BOE scheduler

    BODS application fulfill your requirement, why are you looking for other options? Any specific reason?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.