CHARM: ZMCR not able to proceed once ZMMJ is withdrawn

Hi all,

I created a Change Request (ZMCR) with two follow-up Change Documents (ZMMJ) in scope.

For one Change Document, I made changes to the system and imported the TR into production. The final status of this is now "Imported into Production".

For the second Change Document, I withdrew the change document. I did not create any TRs or whatsoever. The final status is "Withdrawn".

My expectation was, that I can now bring the Change Request to a final status (preferably "Confirmed" or "Realized"), as the change (or part of it) have been implemented.

But I can only set "Scope Extension" or other early status values ("Validation" etc.).

Can anyone explain, if (and why) this is standard behaviour?

And can anyone guide me how to bring a "half-implemented" Change Request to a good end?

Thanks,

Jan

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Nov 18, 2014 at 08:01 PM

    Hi Jan,

    Pls check whether you have maintained the below Status setting for Predecessor Doc :

    Thanks

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      One follow-up:

      When I create an additional ZMMJ and bring this to the final status "Imported into production", then the ZMCR can be closed as wanted.

      With other change documents (ZMAD, ZMGC) this does not happen.

      Problem is, I cannot create an additional ZMMJ all the time when running into the described trap.

      Regards,

      Jan