Hello,
when i tried to reschedule against one of resource, i already got this error.
Qutoa "
Message no. /SAPAPO/DM_SCHEDFAIL003
Detailed information on this message can be obtained by choosing Details on the right-hand margin of the line belonging to the message.
You may need to reduce the width of the Message Text column.
Diagnosis
Given the complexity of the planning problem, the system could not find
any scheduling dates within the maximum number of solution steps
configured internally.
This can have the following causes:
o With the existing load situation on the resources, it is not
possible (or very difficult) for an operation that consists of
several activities to find a suitable slot.
o There are relationships between activities that have maximum time
intervals that either cannot be met, or can only be met with great
difficulty.
System Response
The system does not schedule or reschedule.
"
end quota
Any one have an idea?
thanks