on 11-17-2014 2:22 AM
How to assign a cost center for sample usage when UD posting inspection lot stock.
I have check the inspection lot completion tab for QM Plant setting in customization two fields cost scrap and destroyed
and have enter the cost center in the UD stock posting screen against sample usage field tab document .
However ,it has no effect.
Best regards!
Mishuang Zhao
The "Cost center: Destroyed" in plant level configuration is default cost center for sample usage.
The quality department is usually defined as cost center for destructive inspection.
Therefore you can assign the quality department code as default cost center for goods issue.
As you know, you can change the cost center by clicking the "Document" button on UD screen.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
After the customization of the plant setting about the scrap and destroyed and the UD stock posting sample usage tab document ,
but I haven't got the sample usage to a cost center .
I found the UD code have two options ,accepted rejected
.
I think that is the problem .Whether I should add AX other acceptance decision (see UD text ) on the UD code ?
Thank you!
Best regards!
Zhao
I couldn't understand which problem you have.
If a cost center is not shown as default, please check the controlling area in plant configuration and any enhancement.
If a sample quantity is not set automatically, please check the control indicator of insp. characteristic.
(it should be required and destructive insp.)
Regards
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.